Integrating Klocwork with Electric Cloud
If you run your C/C++ builds in the Electric Cloud environment, you can integrate the integration build analysis with Electric Cloud.
The main steps in the integration process are:
- Generate one or more build specifications for Electric Cloud. Note that a build specification template can also be used for Electric Cloud integrations.
- Run a distributed Klocwork analysis in Electric Cloud, using the build specification(s) as input.
- Create a Klocwork project. See Create an integration project.
- Load the analysis results into the database. See Load the analysis results into the Klocwork database.
Note: The Klocwork Servers must be running for the last two steps. See Starting the Klocwork Servers.